Neighborhood street improvement program 28 (NSIP 28)

Print
Press Enter to show all options, press Tab go to next option

Introduction

NSIP 28 outlines a list of roads that comprise 20% of the City’s total road infrastructure to be treated this year with either a slurry seal or microsurface treatment. The City plans to operate the slurry machine, resurfacing a few streets every week, for as long as the weather and other conditions permit. The city asks all residents that will be affected by the maintenance to check this page frequently for updates on the progress of NSIP 28.

Read the NSIP 28 METHODOLOGY page for a list of all of the streets slated to receive treatment.

Read our Slurry Frequently Asked Questions Page for answers to commonly asked questions about the slurry seal treatment.

If you have unanswered questions about NSIP 28, send an email to slurry@bullheadcity.com.

If you need to discuss an urgent matter related to NSIP 28, call (928)234-8752.

 

UPDATES/PROGRESS

The posted schedules for NSIP 28 are rough estimates only. There are a number of variables including weather conditions and equipment failure that can cause unexpected delays or changes in the schedule. The most up to date information will always be posted in this section of this page.

 No New Updates

 

This Week's Scheduled Maintenance

The City of Bullhead City Public Works Department will begin slurry seal/micro surface treatment on the following streets as a part of the 28th Neighborhood Street Improvement Program (NSIP 28): 

Tuesday April 18th

  • Cresthill Dr from the intersection of Rolling Hills Rd to the intersection of Hillview Dr

Wednesday April 19th

  • Grandhill Rd from the intersection of Rolling Hills Rd to the intersection of Cresthill Dr
  • Country Hills Rd from the intersection of Rolling  Hills Rd to the end of pavement

Thursday April 20th

  • Discovery Rd from the intersection of Sanctuary Dr to the intersection of Sonoran Desert Rd
  • Cul-De-Sac of Discovery Rd from Discovery Rd to the end of pavement
  • Springtime Ct from the intersection of Discovery Rd to the end of pavement

The scheduled days are a target, and a number of factors can put city crews either ahead or behind schedule. Anyone who will be affected by this maintenance is highly encouraged to check the City’s website frequently at www.bullheadcity.com/nsip28 for the most up to date information. Anyone with concerns, comments, or questions about NSIP 28 should send an email to slurry@bullheadcity.com. Anyone with an urgent matter relating to NSIP 28 should call (928)234-8752.

 

Next Week's Scheduled Maintenance

SUBJECT TO CHANGE: Preliminary schedules for the upcoming week of Maintenance are typically formed the Wednesday before work is to begin. A more firm schedule is released the Friday before work is scheduled to begin. All schedules are targets that may or may not be met depending on factors such as weather and equipment failure.

Monday April 24th

  • Sanctuary Dr from the intersection of Larado Dr to the intersection of Sonoran Desert Rd
  • East cul-de-sac of Sanctuary Dr from Sanctuary Dr to the end of pavement
  • West cul-de-sac of Sanctuary Dr from Sanctuary Dr to the end of pavement

Tuesday April 25th

  • Sanctuary Dr from the intersection of Sonoran Desert Rd to the intersection of Lantana Dr
  • Lantana Dr from the intersection of Sanctuary Dr to the intersection of Joshua Tree Ln
  • Joshua Tree Ln from the intersection of Lantana Dr to the intersection of Discovery Rd
  • Granite from the intersection of Rolling Hills Rd to the intersection of Joshua Tree Ln

Wednesday April 26th

  • Sonoran Desert Rd from the intersection of Lantana Dr to the intersection of Sanctuary Dr
  • Discovery Rd from the intersection of Sonoran Desert Rd to the intersection of Lantana Dr
  • Cul-de-sac of Discovery Rd from the intersection of Discovery Rd to the end of pavement

Thursday April 27th

  • Edgewater Dr from the intersection of Rolling Hills Rd to the intersection of Broadmoor Dr
  • Broadmoor Dr from the intersection of Edgewater Dr to the intersection of Sanctuary Dr
  • Wilder Rd from the intersection of Frontier Ln to the end of pavement
  • Frontier Ln from the intersection of Desert Sky Blvd to the end of pavement

 

Map of NSIP 28

2016-06-21_NSIP 28Read the full list of streets slated to be a part of NSIP 28 on the METHODOLOGY page.