Right-Of-Way Permits for Subdivisions

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

 

Subdivision Fees

Engineering Plan Review Fees are $325.00 per plan sheet reviewed and are applied to the Right-of-Way Permit as the fees.  After all documentation requested during the review process has been received and approved, Engineering will request the “Notice of Professional Inspection of Grading”* form sealed and signed by the Civil and Soils Engineers and the Arizona Department of Environmental Quality (ADEQ) "Construction Authorization for a Sewage Collection System” form. Once these items are received, the right-of-way permit can be issued. The following must be on file prior to permit issuance:

1. Acceptable Liability Insurance

2. Current City Business License

3. Current Registrar of Contractors License

* A Certification of Grading form is submitted upon completion of the grading.

------------------------------------------------------------------------------------------------------------------------------------------

Engineering Requirements for Preliminary Plats**

The Planning and Zoning Division routes the following Preliminary Plat documentation to the Engineering Division for review:

1. Preliminary Plat Map

2. Preliminary Grading Plan Including Sewer Design

3. Geotechnical Report or Soils Letter from the Civil Engineer

4. Preliminary Drainage Study

5. Wastewater Design Concept Report

6. Water Design Concept Report (if located within Bullhead City's municipal water service area)

 

Engineering notifies Planning and Zoning by memorandum if additional information is required or if the submittal is approved.

------------------------------------------------------------------------------------------------------------------------------------------

Engineering Requirements for Final Plats**

The Planning and Zoning Division routes the following Final Plat documentation to the Engineering Division for review:

1. One set each of the following plans with each set stapled independently of each other:

a. Grading Plans

b. Sewer Plans

c. Paving (Street) Plans

d. Striping and Signage Plans

e. Street Light Plans

f. Storm Water Pollution Prevention Plan

g. Water Plans (if located within Bullhead City's municipal water service area)

2. Storm Water Pollution Prevention Report

3. Wastewater Design Concept Report

4. Water Design Concept Report (if located within Bullhead City's municipal water service area)

5. Final Drainage Study

6. Geotechnical Report or Soils Letter from the Civil Engineer

7. Traffic Analysis Report or Traffic Letter from Engineer

8. Engineer’s Cost Estimate for All Improvements

9. Engineering Plan Review Fees

** The above lists are not inclusive of all requirements for Preliminary and Final Plat Submittals. Refer to the Planning and Zoning Division page or call 928-763-0123 for a complete list of requirements.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer